Quick answer

A rough upper-bound estimate is nameplate kilowatts multiplied by elapsed hours, but real energy use depends on controller duty cycle, heat loss, starting temperature, charge, lid openings, and hold time. Measure kWh at the correct supply and divide by accepted output only when the batch boundary is defined.

Four numbers are often confused

Power is a rate; energy accumulates over time. A furnace labeled 1.4 kW does not necessarily draw that rate continuously, and a marketing melt-time claim is not an energy test.

Decision point What it means Control or limitation
Nameplate kW Rated electrical input context Not measured batch energy
Elapsed time Clock time for the defined cycle Includes waiting and holding
Metered kWh Electrical energy at the measurement point Must match voltage and equipment
kWh/kg good output Energy divided by accepted mass Sensitive to yield and batch size

Create a repeatable baseline

  1. Verify the physical nameplate and regional voltage version.
  2. Define start and stop states, including preheat and cooldown boundaries.
  3. Record alloy, charge mass/form, crucible, ambient condition, lid events, and hold time.
  4. Use a qualified meter installed according to local electrical requirements.
  5. Compare like-for-like batches and investigate drift before promising savings.

What real users ask

Users want a simple cost-per-melt figure, but the current TGF3000 page itself contains conflicting power values. The unit nameplate and measured cycle must control the calculation.

The supplied 607-review dataset is used here only to identify recurring question patterns. It does not establish specifications, frequency, causation, or universal performance.

Safety and limitations

Do not place an unapproved plug-in meter, adapter, or extension lead on a high-load furnace. Circuit and measurement work belongs within the equipment instructions and local electrical rules.

Exact ToAuto models and revisions remain separate.

Capacity is metal-dependent.

The controller display is not automatic proof of bath temperature.

No unresolved maximum-temperature value should be used to justify a process.

Frequently asked questions

Is kW the same as kWh?

No. kW is power; kWh is energy accumulated over time.

Can I estimate cost from the product page?

Only as a dated scenario with verified wattage, time, tariff, and duty-cycle assumptions.

Why can kWh per kilogram fall with a larger batch?

Fixed heat losses may be spread over more output, but capacity, freeboard, circuit load, and process limits still apply.

Bottom line

Use nameplate power for a bounded estimate and metered kWh for evidence. A defensible cost baseline ties energy to a defined heat and accepted output.